LFP is a Canned/Pouch Sweet Corn Kernels, Seasonal Fruits, Sugar Palm Seed, Pickled items manufacturing in Thailand for over 30 years

SUSTAINABILITY

SUSTAINABILITY

RECYCLE WATER

RECYCLE WATER

RECYCLE WATER 26 March 2024 The water after treated and ready to be released to the canal shall be pull back to this recycle water plant to be used around the factory. MORE SUSTAINABILITY RECYCLE WATER Read More BIOGAS Read More Waste Management Read More Organic Farm Read More Waste Water Read More Solar Roof […]

RECYCLE WATER Read More »

BIOGAS

BIOGAS

BIOGAS 26 March 2024 BIOGAS : A renewable fuel that’s produced when organic matter such as food or animal waste in our case is the waster water from production line, is broken down by microorganisms in the absence of oxygen.  Biogas at LFP can produce the energy that equivalent to 800 kW / day MORE

BIOGAS Read More »

Waste Management

Waste Management 22 December 2023 This project is for plowing corn fields after harvesting, do not burn the corn cobs which add more minerals to the soil and the most importantly can reduce the pollution PM 2.5 in the air significantly MORE SUSTAINABILITY Waste Management Read More Organic Farm Read More Waste Water Read More

Waste Management Read More »

Organic Farm

Organic Farm 22 December 2023 Currently, the company has a total certified area of 320 Rai or 160,000 Square Meters or 51.2 Hectares Within this 320 Rai, it is divided into 100 Rai or 50,000 Square Meters or 16 hectares of Cultivation area. MORE SUSTAINABILITY Waste Management Read More Organic Farm Read More Waste Water

Organic Farm Read More »

Waste Water Treatment

Waste Water Treatment 22 December 2023 Lampang Food Product decided to install the UASB water treatment tank to be used together with the old waste water treatment pond (earthen pond) to which can treat the water 1,500 cbm/day Apart from this new system, a by-product of this installation is the BIOGAS that can be recovered

Waste Water Treatment Read More »

SOLAR ROOF TOP

Solar Roof Top

Solar Roof Top 22 December 2023 Solar Roof Top Phase 1408.24 kW,  Start operating since January 2023. Phase 2 will be starting by February 2024430.1 kW,  Start operating since February 2024 and expected more or less the same saving as the 1st phase. Total energy savingequivalent to 754,000 kWh or approximately about 4 Million Baht

Solar Roof Top Read More »